Construction Services for Laboratory Renovation and Expansion at NREL
Summary of important facts, details, and requirements
- Location of work
- Golden, CO, USA
- Bids due date
- November 15, 2023
- Department and office
- ENERGY, DEPARTMENT OF
ALLIANCE SUSTAINABLE ENRGY-DOECONTR - Set aside
- N/A
This contract is seeking construction services for the renovation and expansion of laboratory spaces at the National Renewable Energy Laboratory (NREL). The project involves the complete renovation and expansion of approximately 3000 sq. ft of laboratory spaces and associated support spaces in the FTLB. The scope of work includes demolition, space reconfiguration, asbestos removal, installation of new casework and chemical hoods, new finishes, high purity piping, plumbing, HVAC equipment, and electrical installations. The renovated laboratory facilities will support microbial bioenergetics research within the Biosciences Center. The contract also requires the removal and reconstruction of casework, chemical hoods, interior walls, HVAC equipment, plumbing, piping, electrical systems, and fire systems. The important dates for this contract are as follows: 9/20/2023 - Intent to Propose Due, 10/6/2023 - Technical Questions Due. For more details and attachments, please refer to the provided link.
NREL - CONSTRUCTION SERVICES: FIELD TEST LABORATORY (FTLB) MICROBIAL ENERGETIC LABORATORY
Full details from SAM.gov
- Location of work
- Golden, CO, USA
- Bids due date
- November 15, 2023
- Department and office
- ENERGY, DEPARTMENT OF
ALLIANCE SUSTAINABLE ENRGY-DOECONTR - Set aside
- N/A
Construction Services needed at NREL (Amended See Attachments). This project requires the successful awardee to completely renovate and expand approximately 3000 sq. ft of laboratory spaces and some associated support spaces in the Fuel Test Laboratory Building (FTLB) at the National Renewable Energy Laboratory (NREL) located in Golden, Colorado. The scope includes demolition and space reconfiguration, coordinating with NREL for asbestos removal from existing chemical hoods, providing new casework and chemical hoods, new finishes, high purity piping, plumbing, HVAC equipment and electrical installations for lighting and equipment. The laboratory facilities support microbial bioenergetics research within the Biosciences Center that will strategically position Biochemical and Biophysical characterizations in adjacent areas to better coordinate generation of redox enzymes, strains development and the analytical capabilities in a safe manner. The work effort also requires removal of casework, chemical hoods (including coordinating removal of asbestos containing hoods) interior walls, HVAC equipment, plumbing, piping, electrical, fire, etc. and reconstructing the laboratory areas included in FTLB 173, 174, 175, 176, 178 and fan coil units in the neighboring office area, including all scope shown on the drawings and in the project specifications. Important Dates: 9/20/2023 - Intent to Propose Due 10/16/2023 - Technical Questions Due - in acccordance with the attached Amendment 2 11/15/2023 - Proposals Submission Deadline - in accordance with the attached Amendment 5; Please note Amendment 5 is quite detailed and contains important information other than the extension Deadline. Please review attachments to the herein posting for further details. Additional attachments can be found at https://app.box.com/s/83zltcveg4m3g0rje3mrjwotcdghjbhs