GAOA GIBBS WASH BRIDGE REPLACEMENT
Summary of important facts, details, and requirements
- Location of work
- Tucson, AZ, USA
- Bids due date
- October 3, 2023
- Department and office
- AGRICULTURE, DEPARTMENT OF
USDA-FS, CSA SOUTHWEST 7 - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
The US Government is seeking a contractor to replace the Gibbs Wash Bridge in Coronado National Forest, AZ. The project involves the demolition of the existing bridge and the construction of a new bridge in its place. The contractor will be responsible for all aspects of the project, including design, engineering, and construction. The project must comply with all applicable laws, regulations, and standards. The contractor must also provide all necessary equipment, materials, and labor. The project is expected to be completed within a specified timeframe. The deliverables for this contract include a fully functional and safe bridge that meets all required specifications and standards.
GAOA Gibbs Wash Bridge Replacement, Coronado National Forest, Az
Full details from SAM.gov
- Location of work
- Tucson, AZ, USA
- Bids due date
- October 3, 2023
- Department and office
- AGRICULTURE, DEPARTMENT OF
USDA-FS, CSA SOUTHWEST 7 - Set aside
- Total Small Business Set-Aside (FAR 19.5)
SBA
GAOA GIBBS WASH BRIDGE REPLACEMENT, CORONADO NATIONAL FOREST, AZ.